Current restoration and resiliency plans include thin-layering sediment restoration. Credit: Steve Droter

Blackwater NWR is currently attempting thin-layering sediment restoration. “We’re trying to build up the elevation of the marsh with local dredge material coming out of the river channel. If it’s possible to sustain the marsh for another 50 to 100 years — that will have management implications for us into the future,” says Simmons, pictured with Whitbeck. Credit: Steve Droter

Current restoration and resiliency plans include thin-layering sediment restoration. Credit: Steve Droter

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s